
Workshop
6,000 m² in Turgutreis and 48 craftspeople. Hull, interior, rig and final tuning by the same team.
- workshop
- 6,000 m²
- craftspeople
- 48
- boats / year
- 12
- sea trials
- 3 days
Eight months of a Meltem 46
Month 11 Lines and mould
The hull is drawn for the short Aegean chop; the mould is made in our own workshop.
Months 2–32 Hull
Vinylester resin, vacuum infusion. Below the waterline an extra layer protects against osmosis.
Months 3–43 Keel and structure
The cast iron keel is fixed with stainless bolts; the inner grid is laminated to the hull.
Months 4–64 Interior
Oak or mahogany; furniture made in our joinery, varnished by hand.
Month 75 Rig and sails
Mast, shrouds and lines go up; sails are cut to the boat's own measurements.
Month 86 Sea trials
Three days in Bodrum bay: speed, heel, engine and every system. You get the report.
Images are representative.
What we measure before handover

- Hull moisture and laminate thickness
- Torque check on every keel bolt
- Water test on every deck hatch
- Rudder and rig checked under load
- Sea trial in the meltemi (over 16 kn)

International Boat Show · Istanbul · 20–24 February 2027 · Stand A-07
Meet us at the show, then sail with us in Bodrum
The Meltem 46 is afloat at our stand. You can also book a trial sail in Bodrum for the days after the show.